Testimonials
Thanks to Rowan and the team at Msteel with their ability meet our ambitious expectations. Their contributions throughout the project from quoting to after sales service was unquestionable. We look forward to the next project that we can work together on.
Jonor Construction has used Msteel as our preferred Structural Steel Fabricator for over a decade. We depend upon the quality of work, fast turn around and reliability that Msteel provides. Galvanising undertaken “in house” within the Meneghello Group and across the road, is a huge advantage for us, as we know that fabricated components are not waiting around for weeks in a queue to be galvanised. Emergency components are often rushed through in one or two day’s notice.Mario, Clayton and Rowan are always professional and easy to deal with and will generally respond to me immediately with any concerns or queries I may have. They also have the ability to deliver orders of varying sizes from 100kg to 100T. I would not hesitate in recommending Msteel for your Fabrication needs.
We used Msteel to fabricate all required steel components and fixings for the emergency repair works project at the Fremantle Traffic Bridge. All employees I dealt with were great to deal with and were very helpful. They were very accommodating with our delivery needs as due to the small nature of our site laydown we sometimes had split deliveries with some steel being brought to the laydown area and some delivered straight onto our barge at a nearby jetty. Multiple steel orders were required as the job kept growing and altering resulting in numerous quotes and purchase orders.Quotes from Msteel would come back very fast which allowed us to order the required steel and receive it in a timely manner so the job could keep progressing on schedule. For this job we required a mixture of steel finishes from black steel to zinc coated to hot dip galvanised, this was never an issue and finishes were always perfect.
GenOffGrid have worked with Meneghello Steel on numerous major projects including the Broome Boulevard Solar Array which is the largest Solar Car Park in Western Australia. The Broome Airport Canopies presented unique challenges with the design being in a Cyclonic wind region. M steel have a professional and collaborative approach to their project design, the fabrication was completed on time and on budget to a very high standard. Due to the team’s input and knowledge in the planning & manufacturing phase installation was completed seamlessly with all steelwork installed in 4 days, a week ahead of schedule.
"*" indicates required fields